AMBER logo AMBER instrument Visit the VLTI website
Site map Come back to home Restricted acces
You are here : Home > Public outreach > Picture Gallery > Installation of the cryogenic pipes
Recent Events

Check also the AMBER/ESO site
http://www.eso.org/sci/facilities/paranal/instruments/amber

Astronomical community

Part of the web site dedicated to the astronomical community

AMBER Documents
Observing with AMBER
Data Processing
Publications
Miscellaneous

Public outreach

Part of the web site dedicated to the general audience.

AMBER Consortium
Picture Gallery
Short presentation
VLT Interferometer
Press room

 

In the same section :
AMBER team at Paranal
The AMBER AIV web page by Andrea Richichi
VLT activities and sceneries during the AMBER integration
2. Optical alignment of the warm optics
6. First observations
3. Installation of the spectrograph and the detector
5. Global optical alignments
Host of AMBER: the VLTI
1. Mounting the warm optomecanics

4. Installation of the cryogenic pipes
Pictures by Yves Bresson
Wednesday 3 March 2004, by Sylvie Robbe


JPEG - 57.6 kb
The interferometric laboratory.
JPEG - 62.8 kb
A lot of hands to control the path of the cryogenic pipes from the control room to the AMBER table.
JPEG - 56.3 kb
Everything’s under control.
JPEG - 62.7 kb
Taking risks.
JPEG - 41.3 kb
Matteo, Alain and Pierre making sport.
JPEG - 57.8 kb
Don’t let go !
JPEG - 57.4 kb
Released Matteo.





Site map | Home | Admin