AMBER logo AMBER instrument Visit the VLTI website
Site map Come back to home Restricted acces
You are here : Home > Public outreach > Picture Gallery > First commissioning run
Recent Events

Check also the AMBER/ESO site
http://www.eso.org/sci/facilities/paranal/instruments/amber

Astronomical community

Part of the web site dedicated to the astronomical community

AMBER Documents
Observing with AMBER
Data Processing
Publications
Miscellaneous

Public outreach

Part of the web site dedicated to the general audience.

AMBER Consortium
Picture Gallery
Short presentation
VLT Interferometer
Press room

 

First commissioning run

From 19 May 2004 to 31 May 2004, AMBER has been commissionned with the siderostats, 2 UTs with adaptive optics and with three UTs.



Saturday 5 June 2004
AMBER observes through three 8m telescopes simultaneously
by Fabien Malbet , Romain Petrov

Friday 4 June 2004
First fringes with the VLT unit telescopes
by Fabien Malbet , Romain Petrov




Site map | Home | Admin